USED TECHNIQUES
![]()
Complete Inspected and assurance to quality
![]()
Completed before time interval within 16 Months
MAIN GOALS
- To rectify Door Malfunctioning of Blue and Red Line
- 4800 PCB installation
- Completed two depots
DESCRIPTION
Replacement of high grade electronics components. and Integrated Circuits in each set of Door Control Unit (DCU) cards including all man power, consumables, machine ,tools, transport etc. as per Scope of work and term and condition of contract.








